The Hydraulic Examination Rules carries 1 published figure read from 1 source's own page, from 28 to 28 day, read 24 October 2026.
2 of the 13 named sources read in full publish a figure; 11 publish none, read 24 October 2026.
Every figure, with its source
One row per published figure: the figure as the source's own page publishes it, the page, and the day it was read. A figure that is not on a page we read is not on this one.
| Source | Figure | Read |
|---|---|---|
| Pressure Systems Safety Regulations 2000, regulation 9 (examination) | 28day | 2026-10-24 |
| PUWER (Northern Ireland) 1999 | 6month | 2026-09-12 |
The sentence each figure was read from (2)
- Pressure Systems Safety Regulations 2000, regulation 9 (examination), read 2026-10-24:
within 28 days of the completion of the examination (or, in the case of integrated installed systems where the examination is part of a series, within 28 days of the completion of the last examination in that series); or
- PUWER (Northern Ireland) 1999, read 2026-09-12:
at least every 6 months, in other cases; and
Read in full, publishes no figure
11 named sources were read in full on the dates shown and print no usable figure. They are counted, never filled in.
- LOLER 1998, regulation 9 (thorough examination and inspection), read 2026-09-12: read in full and no accepted figure on the page
- LOLER 1998, regulation 2 (interpretation), read 2026-09-12: read in full and no accepted figure on the page
- PUWER 1998, regulation 6 (inspection), read 2026-09-12: read in full and no accepted figure on the page
- Pressure Systems Safety Regulations 2000, regulation 8 (written scheme of examination), read 2026-09-11: read in full and no accepted figure on the page
- LOLER (Northern Ireland) 1999, read 2026-09-11: every candidate on the page was refused
- HSE - LOLER overview, read 2026-10-16: read in full and no accepted figure on the page
- HSE INDG339 - thorough examination and testing of lifts, read 2026-09-11: read in full and no accepted figure on the page
- HSE INDG178 - written schemes of examination, read 2026-09-11: read in full and no accepted figure on the page
- HSE L22 - safe use of work equipment (PUWER ACOP), read 2026-09-12: read in full and no accepted figure on the page
- HSE - PUWER open learning guidance, read 2026-09-12: read in full and no accepted figure on the page
- HSENI - work equipment and machinery guidance, read 2026-09-12: read in full and no accepted figure on the page
Methodology
Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2).
2 of the 13 named sources that could be read published a usable figure; 11 published none and are recorded as not published, never filled in; 0 could not be read (blocked, dead or unreachable) and count nowhere.
The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source in day (a source's median where its page yielded several accepted sentences), so N counts sources, never sentences; 4 candidate sentence(s) were refused by a reviewer with the reason recorded.
The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): one row per jurisdiction (GB, Northern Ireland) per instrument per duty: what triggers an examination, on what interval, by whom, and what record must exist afterwards, quoted verbatim from the instrument or the regulator with its effective date.
The cross-reading nobody publishes: which of the four regimes a given repair actually lands in - a hose on a digger, a ram on a tail lift, an accumulator on a press are three different answers - as a decision table generated from the rows, with the GB and NI instruments side by side.
4 candidate sentences on these pages were refused by a reviewer; each refusal and its reason is recorded in the review ledger.
Sources (13)
- LOLER 1998, regulation 9 (thorough examination and inspection)(the publisher's own terms; quoted for reporting and comment)
- LOLER 1998, regulation 2 (interpretation)(the publisher's own terms; quoted for reporting and comment)
- PUWER 1998, regulation 6 (inspection)(the publisher's own terms; quoted for reporting and comment)
- Pressure Systems Safety Regulations 2000, regulation 8 (written scheme of examination)(the publisher's own terms; quoted for reporting and comment)
- Pressure Systems Safety Regulations 2000, regulation 9 (examination)(the publisher's own terms; quoted for reporting and comment)
- LOLER (Northern Ireland) 1999(the publisher's own terms; quoted for reporting and comment)
- PUWER (Northern Ireland) 1999(the publisher's own terms; quoted for reporting and comment)
- HSE - LOLER overview(the publisher's own terms; quoted for reporting and comment)
- HSE INDG339 - thorough examination and testing of lifts(the publisher's own terms; quoted for reporting and comment)
- HSE INDG178 - written schemes of examination(the publisher's own terms; quoted for reporting and comment)
- HSE L22 - safe use of work equipment (PUWER ACOP)(the publisher's own terms; quoted for reporting and comment)
- HSE - PUWER open learning guidance(the publisher's own terms; quoted for reporting and comment)
- HSENI - work equipment and machinery guidance(the publisher's own terms; quoted for reporting and comment)
Cite or embed this figure
The Hydraulic Examination Rules carries 1 published figure read from 1 source's own page, from 28 to 28 day, read 24 October 2026.
2 of the 13 named sources read in full publish a figure; 11 publish none, read 24 October 2026.
Cite as: "hydraulicrepairquotes.co.uk Hydraulic Examination Rules", updated 2026-10-24, https://hydraulicrepairquotes.co.uk/datasets/hydraulic-examination-rules/.
Download the CSV (2 rows, computed 2026-10-24)